Upgrading and Rehabilitation of Tabora Airport


The Project was including  the  following areas:

Replace existing runway pavement (1900 x 30m)

Link taxiways

Storm water drainage system

Resa at both end

Apron (2000m2)

Substation

 

Details


  • Price: TZS 20,491,117,159
  • Financier: WB
  • Duration: Miezi 20
  • Status: Completed
  • Location: Tabora Airport