Upgrading and Rehabilitation of Bukoba Airport


The Project was including  the  following areas:

Replace runway (1400 x 30m)

Link taxiways

Storm water drainage system

Resa at both end

Apron (9800m2)

Access road

Parking area

Terminal building (1400m2)

Substation

Perimeter fence

Other utility services

Details


  • Price: TZS 20,491,117,159
  • Financier: WB
  • Duration: 20 Month
  • Status: Completed
  • Location: Bukoba Airport