To construct Car Parking Area.


To construct Car Parking Area at Arusha airport.

  1. Fill G15 varying thickness on raised walkways (480m3)
  2. Gravel G45 Sub base course Layer (392m2)
  3. Base course CRS (150mm thick) for additional Car Parking area (392m2)
  4.  First Seal 20mm (2610m2)
  5. Second Seal 10mm (2610m2)
  6. Drainage works concrete spoon drain (148m) 

Details


  • Price: TZS 926949310
  • Financier: OwnSource
  • Duration: 6 Months
  • Status: In Progress
  • Location: Arusha Airport